
Automatic Control Metal Slitting Machine Durable Carbon Steel / Galvanized Coils
Description
Slitting line machine is not only for the steel service cutting industry, but also for the steel pipe industry. Slitting lines are widely used in metal sheet processing industry. Slitting line can do de-coiling, slitting and recoiling works, make coil steel to any needed width coil steel. It mainly includes coil car, un-coiler, coil guide, slitting machine, scrap winder, tension unit, re-coiler and coil car, hydraulic system, Etc. It mainly used in coil or hot rolling carbon steel, silicon steel and all the other kinds of metal materials with surface spreading. This line can be adjusted to do recoiling or dividing work to meet customer’s demand.
Specifications
A - HYDRAULIC COIL CART
B - HYDRAULIC DECOILER
C - LOOP SYSTEM
D - HEAD-GUIDING&HEAD SHOVEL
E - 2ROLLER FEEDING
F - DEVITATION RECTIFYING
G - SLITTING
H - SIDE WASTE RECOILER
I - LEVELLING UNIT
J - PRE-SEPERATOR&TENSIONING MEASURING MACHINE
K - RECOILER
L - UNLOADING COIL CART
M - HYDRAULIC CONTROLLER
N - ELECTRICAL CONTROLLER
Technical data
Productivity | SLIT COIL(0.5-4.0)X1300MM |
Main power required | ONE OPERATOR WITH TWO ASSISTANT |
Total power required | 250K.W |
Set up Time | 20MIN |
Working hours per day | 8 TO 24 |
Direction | Left to Right while facing operator panel |
Overall machine length required | 26M |
Overall packing Dimension | 3 trucks |
Approximate machine height | 1.8M |
Type of material to be processed | Carbon steel/Galvanized coils |
Max. width of coil | 1300MM |
Min. width of coil | 300MM |
Thickness of coil | 0.5-4.0MM |
Max. weight of coil | 15TONS |
Variable line speed | Max.120mtr./min |
Material loading/Unloading system | Automatic |
Coil inner diameter | 508mm |
Coil outside diameter | 1000mm |
After-sale service
1.The seller take responsibility to installation and commissioning of the equipment and free training. After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated.
2.Stud and Track Roll Forming Machine Installation period: about 5 days after the complete preparation by the buyer such as the foundation and all necessary accessories.
Training time: 5 days.
3.Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility.
4.The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.)
Application
Steel slitting cutting, metal slitting , metal sheet striping
Advantages
Picture
Wuxi Luole Machinery Co., Ltd
Company introduction
We are located in Wuxi city, Jiangsu province, specializes in manufacturing various types of high speed, high precision roll forming machines, with more than 15 years’ experience. It has gained highly praise by customers from all over the world, due to top quality and competitive price of the products. Company principle: top quality, low price.
Wuxi Luole Machinery Co., Ltd is a high tech enterprise . We a professional manufacturer of cold forming equipment (especially high difficulty cold formed steel), wins the trust of customers by its honesty, pragmatic operation philosophy, advanced technology, innovative design thinking, excellent quality, superior after sales service, competitive price, etc.
Main products
We mainly produce all kinds of roof/ wall tile roll forming machine, C purlin, Z purlin, C&Z interchangeable purlin roll forming machine, solar photovoltaic forming machine, shelf column roll forming machine, guardrail roll forming machine, cable tray roll forming machine, metal deck roll forming machine, down pipe roll forming machine, rolling shutter door roll forming machine, cut to length machine, eps/pu sandwich panel production line, slitting line, automatic stacker, etc, mainly in construction use.
After sale service
1). Engineer will give free training lessons to labors in buyer’s factory.
2). The Buyer will buy the round-trip air ticket for Engineer if visa application is approved. The buyer is also responsible to bear expenses generated, e.g. visa formalities, meals, accommodation and allowance of USD80 for engineer per day.
3). During this guarantee period, we will provide spare parts without any charge in case of quality discrepancy caused by us. If the malfunctions are caused by your incorrect operations, we will provide the buyer spare parts at cost price.
4). We will charge the buyer cost price of spare parts beyond one year and provide long-term technical guide.
Photo of the factory