
Biodegradable Sugarcane Moulding Pulp Equipment Paper Plate Making Machine
Specifications:
Model Type | TS-01 | TS-03 | TS-05 | TS-10 |
Capacity | 700 pcs/h | 2000 pcs/h | 3500 pcs/h | 7000 pcs/h |
Workshop Requirement | 200 m2 | 300 m2 | 500 m2 | 800 m2 |
Heating Method | Electricity | Electricity | Electricity | Conduction Oil |
Electricity Consumption | 65kw | 120 kw | 200 kw | 400 kw |
Electricity Installed | 90 kw | 230 kw | 360 kw | 250 kw |
Material Consumption | 15~18kg/h | 32~ 40 kg/h | 60~ 70 kg/h | 120~ 140 kg/h |
Water Consumption | 60~80kg/h | 100 ~ 150 kg/h | 150 ~ 200 kg/h | 500 ~ 800 kg/h |
Worker Requirement | 4 persons | 6 persons | 9 persons | 15 persons |
Container Requirement for Shipment | 1x 40’ HQ | 2x 40’ HQ | 3 x 40’ HQ | 6 x 40’ HQ |
Forming Type | Vacuum suction, thermoforming | Vacuum suction, thermoforming | Vacuum suction, thermoforming | Vacuum suction, thermoforming |
Drying Method | Drying in mould | Drying in mould | Drying in mould | Drying in mould |
Notes:
|
Descriptions:
Production Information and Our Warranty:
Applications:
Food container | Dishware, tableware, lunch box, bowl… |
Artware | Mask, Christmas balls, Easter Eggs , boutiques… |
Disposable Medical Care Products | Bedpan, sick pad, female urinal… |
High quality packages | Mobile phone package, camera package, 3D wall plate |
![]() |
Competitive Advantages:
Business Terms
NO. | ITEM | DESCRIPTION |
1 | Payment Terms | 30% down payment by T/T, 70% before shipment by T/T or L/C at sight |
2 | Delivery Terms | FOB Guangzhou, China. (Final transaction could be made in C&F or CIF, the freight and insurance should be decided according to the current rate when signing the contract). |
3 | Delivery Time | 45-75 days |
4 | Packages | Packages suitable for ocean transport. The small parts are packaged by wooden boxes. The big parts are protected by wooden support. |
5 | Installation | Seller should appoint 2 engineers to instruct buyer for installation, test-run and training. All the charges including air ticket, VISA , accommodation and food of the engineers should be responsible by buyer. Besides, the buyer should pay the engineers subsidy of USD50/person/day and offer translation service. |
6 | Warranty | 12 months after installation |
7 | After service |
|
8 | Quotation Validity | 90 days after the offering date |
Working Theory:
Schematic Diagram:
Guangzhou Nanya Pulp Molding Equipment Co., Ltd.
NANYA was set up in 1994 and now we have two production bases,covers over 40,000 square meters, now it’s one of the earliest and biggest pulp molding machines manufactures in China and becomes the leading pulp molding machinery supplier in the world.
NANYA has more than 50 persons in R&D centre, with specific professional technicians taking charge of machinery, heat energy, electrical engineering, mould process center and paper making technology.
NANYA has established long term cooperation with renowned universities, Guangdong University of Technology (GDUT) and South China University of Technology (SCUT). We together develop and apply the advanced technology at home and abroad these years.
NANYA machines obtained CE certificate and passed TUV and SUS inspection. NANYA adopts the international brands for spare parts and auxiliary equipment, such as Siemens/Schneider /Festo, etc.
NANYA has exported machines and moulds to more than 80 countries and regions and enjoys good reputation among customers.
NANYA will provide the optimal solution for you to replace plastic and Styrofoam. Let’s make joint effect for a greener world.