♥ In Botou, we are the first to do pressure roll forming machine export business
♥ As a manufacturer we are specialized in all kinds of roll forming machine.
♥ Good experience of 20 years to make roll forming machine.
♥ Good experience for export more then 40 countries.
♥ Provide best price,good quality and fast delivery.
De-coiling →feedinig→forming→step-formed mechanism →cutting →product
1 | Model No. | Keel Roll Forming Machine |
2 | Thickness | 0.3-0.8mm |
3 | Coli material | GI |
4 | The bearing capacity of manual decoiler | 6.5 tons |
5 | shaft material | 45#steel |
6 | Out diameter | Customized |
7 | numbers of forming steps | Customized |
8 | transmission | chain transmission |
9 | Forming speed | 10-15m/min |
10 | main motor power | 3kw |
11 | voltage | 380V50HZ Three-phase or as required |
12 | dimension | 5*1.3*1.3 |
13 | cutting | hydraulic cutting |
14 | blade material | Cr12 steel with quenched treated 60-62°c |
15 | control system | PLC(Delta) |
16 | length tolerance | ±1mm |
17 | spare parts | 1 easy demaged parts:conk 2pcs, fuse-link 4pcs 2 rubber mat: 1 pcs 3 bolt spanner: 1 pcs |
18 | The whole line including: Manual decoiler, roll forming machine, hydraulic station, hydraulic cutter, PLC control system, run-out table. |
Usage: It is used to support the steel coil and uncoil it in a turntable way.
Inner diameter:350-450mm
Outer diameter:450mm
Coil width:300mm
Capacity:1.5T
Advanced hydraulic system from Taiwan
Usage: It is used to provide power for cutting devices.
Power: 3kw
Usage: Automatic length and quantity measurement.
Screen: touch screen
Frequency:Delta
PLC control
PLC:Delta
2 sets with 3 meter’s long.
- The seller take responsibility to installation and commissioning of the equipment and free training. After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated.
- Installation period: about 5 days after the complete preparation by the buyer such as the foundation and all necessary accessories.
- Training time: 5 days.
- Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility.
-The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.)
Jiangyin Dingbo Technology Co., Ltd
Company introduction
We are located in Jiangyin city, Jiangsu province, specializes in manufacturing various types of high speed, high precision roll forming machines, with more than 20 years’ experience. It has gained highly praise by customers from all over the world, due to top quality and competitive price of the products. Company principle: top quality, low price.
We a professional manufacturer of cold forming equipment (especially high difficulty cold formed steel), wins the trust of customers by its honesty, pragmatic operation philosophy, advanced technology, innovative design thinking, excellent quality, superior after sales service, competitive price, etc.
Main products
We mainly produce all kinds of roof/ wall tile roll forming machine, C purlin, Z purlin, C&Z interchangeable purlin roll forming machine, uni channel forming machine, rack shelf roll forming machine, guardrail roll forming machine, cable tray roll forming machine, metal deck roll forming machine, down pipe roll forming machine, rolling shutter door roll forming machine, auto stacker, EPS/PU sandwich panel production line, slitting line, cut to length line, tube mill, etc, mainly in construction use.
After sale service
1). Engineer will give free training lessons to labors in buyer’s factory.
2). The Buyer will buy the round-trip air ticket for Engineer if visa application is approved. The buyer is also responsible to bear expenses generated, e.g. visa formalities, meals, accommodation and allowance of USD100 for engineer per day.
3). During this guarantee period, we will provide spare parts without any charge in case of quality discrepancy caused by us. If the malfunctions are caused by your incorrect operations, we will provide the buyer spare parts at cost price.
4). We will charge the buyer cost price of spare parts beyond one year and provide long-term technical guide.
Photo of the Factory
Photos of the Office
Our clients